These are shots of the San Antonio Riverwalk Grotto Construction Project.
We had to divert the San Antonio river from flowing past us so we could work in the basin. It was a hot summer but we got over 4,000 sq. foot covered with the Quikspray Carousel Pump We needed a man hoist to lift the spray nozzle up quite a distance and she still pumped away. We had some blow-outs with the sand not being screened well enough but with a large crew we-got-er-done. Some of the project required the making of stalactites and the pump was able to be controlled enough to handle that part of it.